Vegetation Management Insights for Electric Utilities
Plain guides on lidar, vegetation management and GIS for electric co-ops and small utilities.
Is Your GIS Line Where the Cleared Corridor Is?
How lidar shows where a line's cleared corridor sits beside the mapped line, and what that says about GIS accuracy and pole positions.
Satellite, Aerial Photos or Lidar: What Works for Line Vegetation
We tested all three on real feeders. What satellite, aerial photos and lidar can and can't show about trees along distribution lines.
FAC-003-5 vs FAC-003-4: What Changed
FAC-003-5 took effect April 1, 2024. What changed: line applicability, IROL references, and R2 now reserved.
Lidar Survey Cost per Mile for Power Lines
What a new lidar survey costs per mile, what drives the price, and when free public USGS lidar is enough.
False Positives and False Negatives in Vegetation Screening
Why satellite screening flags clean spans and misses real problems, what a co-op line walk showed us, and how to cut both.
Satellite-Powered Vegetation Monitoring for Utilities
What Sentinel-2 satellite pictures can and can't show about vegetation along power lines.
NERC FAC-003 138kV Vegetation Clearance Requirements
Detailed guide to minimum vegetation clearance distances for 138kV transmission lines. MVCD tables and buffer zone calculations.
Vegetation Management for Electric Cooperatives: Complete 2026 Guide
Complete guide to vegetation management for electric cooperatives: budget strategies and where satellite screening fits.
How Electric Utilities Automate Vegetation Monitoring with AI
How utilities automate transmission vegetation monitoring with satellite imagery, and where it falls short.
5 Common NERC FAC-003 Audit Failures (And How to Avoid Them)
The most common FAC-003-5 audit failures and how transmission owners avoid them.
NERC FAC-003 Version History: From -1 to -5
Earlier FAC-003 versions and a link to the current FAC-003-5 vs FAC-003-4 comparison.
FAC-003-5 Vegetation Clearance Requirements Explained
Which transmission lines are covered, MVCD, annual inspections, and what changed from FAC-003-4.
Get a free lidar check of one feeder
Send one feeder's line file. Get a span-by-span report back by email, usually within a few business days. No contract. No credit card.