Back to Blog

    FAC-003-5 vs FAC-003-4: What Changed

    Updated November 4, 2026 · 4 min read

    FAC-003-5 became enforceable on April 1, 2024. It is the current version of the transmission vegetation management standard; FAC-003-4 is the previous version. The changes covered here are line applicability, removal of the explicit reference to IROL facilities, and R2 becoming reserved for future use. This is a short comparison of those changes, not a list of additional changes to the standard.

    Before and after

    The table separates the previous version from the current wording. It does not compare clearance distance values or introduce new clearance distances. Use the current standard when checking which lines are covered and which requirements apply.

    TopicFAC-003-4 (previous)FAC-003-5 (current)
    VersionFAC-003-4: previous versionFAC-003-5: enforceable April 1, 2024
    Lower-voltage applicability wordingExplicit IROL referencePlanner identification for instability, Cascading or uncontrolled separation; Major WECC Transfer Path identification
    IROL referenceExplicitly referencedExplicit reference removed
    R2Separate requirement numberReserved for future use; all applicable lines fall under R1

    Which lines FAC-003-5 covers

    Applicability 4.2 covers every overhead transmission line operated at 200 kV or higher. For overhead transmission lines below 200 kV, there are two routes into scope. The Planning Coordinator or Transmission Planner can identify a line because its loss is expected to cause instability, Cascading or uncontrolled separation. A line below 200 kV is also covered when WECC identifies it as part of a Major WECC Transfer Path.

    Voltage alone therefore does not put every lower-voltage transmission line in scope. A 138 kV line, for example, is covered only when it meets the planner-identification test or the Major WECC Transfer Path test. FAC-003 covers transmission lines. Distribution lines are not covered by it. Keep that distinction clear when reading transmission requirements alongside a distribution maintenance program.

    The explicit IROL reference was removed

    FAC-003-5 removed the explicit reference to IROL facilities. For the current lower-voltage scope, use the Planning Coordinator or Transmission Planner identification described above, or WECC's Major WECC Transfer Path identification. Do not carry the old explicit IROL reference forward as the current applicability wording.

    This distinction matters when an older procedure or summary still uses FAC-003-4 language. Label that language as the previous version, rather than presenting it as the current rule. The current scope description needs to name the planner-identification test and the Major WECC Transfer Path test.

    R2 is reserved; applicable lines fall under R1

    R2 is now “Reserved for future use.” All applicable lines fall under R1, which requires managing vegetation to prevent encroachments into the Minimum Vegetation Clearance Distance, or MVCD. A reserved R2 does not remove applicable lines from the vegetation management requirement: R1 is the requirement to use for those lines.

    The current R6 inspection rule

    R6 requires vegetation inspection of 100% of applicable lines at least once per calendar year. There must be no more than 18 calendar months between inspections on the same right-of-way. Both parts matter: the calendar-year requirement and the maximum interval. This is the current inspection rule; it is not presented here as another change from FAC-003-4.

    For more detail on current requirements and MVCD, read the FAC-003-5 vegetation clearance requirements guide. For earlier versions, see the FAC-003 version-history article. The sources below provide the current standard and explanations of the FAC-003-5 update.