High-voltage transmission lines requiring NERC FAC-003 vegetation compliance
    NERC FAC-003-5 Standard

    NERC FAC-003-5 Requirements for Transmission Lines

    FAC-003-5 became enforceable April 1, 2024. It covers applicable overhead transmission lines, not distribution lines. LineGuard is a screening tool for distribution lines and does not make anyone compliant with FAC-003.

    See Distribution Screening

    What is NERC FAC-003-5?

    Applicability 4.2 covers every overhead transmission line operated at 200 kV or higher; lines below 200 kV identified by the Planning Coordinator or Transmission Planner because their loss is expected to cause instability, Cascading or uncontrolled separation; and lines below 200 kV that WECC identifies as part of a Major WECC Transfer Path. Distribution lines are not covered. The explicit reference to IROL facilities was removed.

    NERC FAC-003-5 Core Requirements

    R1: Prevent MVCD Encroachments

    All applicable lines fall under R1: manage vegetation to prevent encroachments into the Minimum Vegetation Clearance Distance (MVCD).

    R2: Reserved

    R2 is now Reserved for future use.

    R6: Inspect Every Applicable Line

    Inspect 100% of applicable lines at least once per calendar year.

    Inspection Interval

    No more than 18 calendar months between inspections on the same right-of-way.

    Standard Update

    What Changed in the Latest NERC Vegetation Standard

    FAC-003-5 vs FAC-003-4

    FAC-003-5 became enforceable April 1, 2024. It changed line applicability, removed the explicit IROL reference, and reserved R2 for future use. All applicable lines fall under R1 to prevent MVCD encroachments.

    Distribution Screening with LineGuard

    LineGuard uses public lidar to screen tree height along distribution lines and help field crews decide which spans to look at first. It does not measure conductor clearance or provide FAC-003 compliance evidence.

    Tree-Height Screening

    Public lidar screens trees along distribution lines.

    Span Priorities

    Rank spans so field crews can decide where to look first.

    Planning Reports

    Screening reports for maintenance planning, not compliance evidence.

    Distribution Screening and Field Review

    Step 1

    Send a Line File

    Use your distribution line file.

    Step 2

    Screen Tree Height

    Public lidar shows trees along mapped lines.

    Step 3

    Review Priorities

    Choose spans for a closer look.

    Step 4

    Check in the Field

    Crews verify actual conditions.

    Step 5

    Plan Maintenance

    Use findings alongside your existing process.

    NERC FAC-003-5 Scope and Inspection FAQ

    April 1, 2024. FAC-003-4 is the previous version.

    Every overhead transmission line operated at 200 kV or higher; below 200 kV, lines identified by the Planning Coordinator or Transmission Planner because their loss is expected to cause instability, Cascading or uncontrolled separation, and lines WECC identifies as part of a Major WECC Transfer Path.

    R2 is now Reserved for future use. All applicable lines fall under R1, which requires managing vegetation to prevent MVCD encroachments.

    Vegetation inspection of 100% of applicable lines at least once per calendar year, with no more than 18 calendar months between inspections on the same right-of-way.

    No. FAC-003 covers transmission lines, not distribution lines.

    No. LineGuard is a screening tool for distribution lines and does not make anyone compliant with FAC-003. It does not measure conductor clearance, provide compliance evidence, or replace field inspections.

    Get a free lidar check of one feeder

    Send one feeder's line file. Get a span-by-span report back by email, usually within a few business days. No contract. No credit card.